We are honoured to be part of the Chenab Bridge installation in Kashmir, the world's highest railway arch bridge.
Usha Martin has been involved in this iconic engineering marvel right from the foundation stage. Our company designed and manufactured the locked coil wire ropes installed on the 'cable cranes,' which have been used to move almost all the segments of the bridge during its construction.
It's a remarkable achievement for us to be associated with such a prestigious project in building the advanced infrastructure of the nation.