We are pleased to share the commissioning of a 474 kWp rooftop solar power system at Brunton Wire Ropes FZCo., our manufacturing facility in Dubai. This initiative marks another meaningful step toward integrating renewable energy into our manufacturing operations.
Installed through an OpEx model, the system comprises 864 solar panels and is supported by a live data monitoring dashboard, enabling real-time visibility into energy generation and performance. The system is expected to generate approximately 804,475 kWh of renewable electricity annually, delivering estimated annual savings of USD 62,430.

Beyond the numbers, this project reflects our commitment to improved energy efficiency, a lower environmental footprint, and more responsible manufacturing practices. By strengthening the renewable energy mix across our operations, we continue to turn our sustainability commitments into tangible, measurable action.

